Dashboard
SR 261 IR-30794-A
INDOT
As the prime contractor on the "Major Moves" reconstruction of over 3 miles of SR 261, Ragle Inc. was fortunate to have the opportunity to improve it home town. Project resulted in 5 travel lanes for over a mile, with 3 travel lanes for two miles. During the project, we orchestrated the safe passage of more that 3,000 students per day through and around our project.

Address Newburgh, IN
Cost $12,196,677.56
Duration 3 Years
Achievements
  • Subgrade Chemical Modification of nearly 130,000 sys.
  • Handled nearly 200,000 cys of material
  • 11,000 LFT of storm sewer pipe and 150 drainage structures
  • 16,000+ SFT of modular block walls
  • Installation of 5 Traffic Signals